About

Keeping communities connected across the globe

Discover the story behind the team redefining what bridge construction looks like

Learn more

Construction workers in safety vests and helmets stand in front of a bridge under construction by a rural road.

Since 2014, InQuik has been redefining concrete construction across multiple segments

An Australian-founded infrastructure company with a smarter way to build. Our patented modular bridge system reduces construction time, cost, and complexity, making quality infrastructure accessible to communities across Australia and around the world.

Another Award
2026
Award name
2026
IPWEA Recognition
of bushfire recovery
2022
AFR Fast 100
2022
Most innovative
companies
2022
Excellence in innovation
2022

Our Values

Great infrastructure starts with the right foundations – in how we think, act, and partner.

‍

Integrity

We grow globally through responsible actions, flexibility and honest & supportive relationships.

‍

Community & sustainability

Building better for the future, our people and our planet.

‍

Adaptable approach

Steadfast in our execution, yet agile in our approach.

White outline of a globe with latitude and longitude lines.

‍

Innovation first

We take humble ideas and change the world.

“We developed the InQuik bridge to keep communities connected, and we’re so proud to be delivering robust and resilient bridges to regional areas across the country, which will serve the residents for the next 150 years or more”

Logan Mullaney, 

InQuik CEO

Our Beginnings
‍

Where it started

Bruce Mullaney was a Southern Tablelands builder and farmer who understood firsthand the challenges facing communities without reliable access.

He developed and patented a method for constructing concrete slabs that would change the way bridges could be built, anywhere in the world.

Working alongside his brother-in-law Jim Howell, Bruce refined the technology so that reinforcing steel and formwork could be assembled off-site and transported ready to pour, eliminating the delays and costs that had long made bridge construction out of reach for remote communities.

Inspired by their father's vision, Logan and Ben Mullaney founded InQuik Pty Ltd in 2017 to bring that idea to scale. What started in rural NSW has since been recognized with the Australian Engineering Excellence Award, ranked the number one modular bridge solution by a World Bank-commissioned report, and patented in over 88 countries worldwide.

Our Journey

2014
First patent lodged: "Module for building a structure"

The foundation of the InQuik system was established with the first patent application, protecting the modular construction technology that would later be InQuik Bridges.

2016
First bridge built

The first InQuik Bridge opens near Goulburn, gaining media attention from Town and Country Magazine and Engineers Australia.

2018
First multi-span bridge built

InQuik partners with the Australian Reinforcing Company (ARC) to manufacture bridge components. March brings the launch of the InQuik Farm Bridge, Integral Bridge, and Multi-Span Bridge.

2021
40 InQuik bridges built

InQuik becomes an LGP Approved Contractor, streamlining procurement processes for NSW councils. Transport and Main Roads approves the InQuik Bridge System for use in Queensland Government projects.

2022
InQuik USA established

Establishment of the InQuik USA office, following the introduction of the Bipartisan Infrastructure Law in 2021, which saw a commitment of US$40 billion for bridges alone.

2023
Heading goes here

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer sed malesuada ipsum. Etiam pellentesque libero ante, at congue dolor ullamcorper ut. Etiam nec velit in justo lobortis tincidunt a a elit. Proin lacinia felis ut orci.

2024
InQuik builds in the Solomon Islands

Installation of two bridges in the Solomon Islands for the Ministry of Infrastructure Development, as part of a World Bank funded project. First InQuik bridges to be installed in a seismic area, utilizing E-grade rebar.

2025
20+ InQuik Bridges Built in the US

InQuik reaches a huge milestone of finishing 20+ bridges in the U.S.

2026
First InQuik Bridge Built in India

InQuik and Tata Steel embark on their first Proof of Concept, building a 6-lane highway bridge in India.

United States
New Zealand
India
Australia
Solomon Islands

Think globally, innovate locally

228+ InQuik structures built across the globe – and counting

What began in rural NSW now operates globally. Working with local contractors, councils and manufacturing partners, we’re bringing faster, safer and more resilient bridges to communities across Australia, the United States, New Zealand, the Solomon Islands and India.

Talk to our team

Whether you're in early scoping or ready to move, our team is here to help you find the right solution for your project.

Partner with us
Crane lowering a metal bridge segment over a river with workers supervising on both sides.
Another Award
2026
Award name
2026
IPWEA Recognition
of bushfire recovery
2022
AFR Fast 100
2022
Most innovative
companies
2022
Excellence in innovation
2022